Return to the DOT Home Page
DOT Contact Information Page



PUBLIC ANNOUNCEMENTS
Road Closures
Public Meetings
Bid Letting Schedule
Project Update

 
WORK REQUESTS
Traffic Signal Reporting Form
Utilities Permit Request
Streetlight Repair Request
Road Maintanance Request
 
CCT
Buy CCT tickets online
CCT Route Descriptions
Park and Ride Lots
Fares

 
ROADWAY & TRAILS
Traffic Cameras
Road Progress Reports
Trails
Planning Studies
Concept Designs

 
DEVELOPMENT REVIEW
Development Standards
Standard Details

 
OTHER
Online Mapping
Cooperative CORS
Airport
Utilities
Additional Links

 
Cobb County Government
(770) 528-1000

information@cobbcounty.org

Privacy Statement



Cobb County...Expect the Best!

 
ROAD REPORT
 

Click here for Road Project Information


Post Oak Tritt Road
Post Oak Tritt Road will be closed to thru traffic between Johnson Ferry Road and McPherson Road beginning Saturday, May 24th, 2008 through Sunday, August 3rd, 2008. The actual points of closure on Post Oak Tritt Road are approximately 125 feet west of McPherson Road and approximately 2000 feet east of Johnson Ferry Road. Closure is necessary due to roadway grade changes and box culvert construction.

Click here to view detour map.
PDF Icon
From Post Oak Tritt Road @ Johnson Ferry Road will be Johnson Ferry Road north to right on Shallowford Road to right on McPherson Road to Post Oak Tritt Road.  Detour from Post Oak Tritt Road @ McPherson Road will be McPherson Road north to left on Shallowford Road to left on Johnson Ferry Road to Post Oak Tritt Road. 
For more information call Cobb County DOT at 770.420.6659 or email DOT.


Bells Ferry Road Bridge Rehabilitation
Bells Ferry Road will be closed to thru traffic between I-575 and Chastain Road  beginning Monday, June 2nd, 2008 through Wednesday, July 23rd, 2008.  The actual point of closure is on Bells Ferry Road approximately 2000 feet north of Chastain Road where Bells Ferry Road crosses Noonday Creek. Closure is necessary due to replacement of box culvert for Noonday Creek.

Click here for detour map.
PDF Icon
Detour route from Bells Ferry Road @ I-575 will be I-575 South to left on Chastain Road (Exit #3) to Bells Ferry Road. Detour from Bells Ferry Road @ Chastain Road will be Chastain Road west to right on I-575 North to Bells Ferry Road (Exit #4). 
For more information call Cobb County DOT at 770.528.1653


Oglesby Road Bridge Rehabilitation
Oglesby Road will be closed to thru traffic between C.H. James Parkway and Frank Aiken Road/ Furr Avenue beginning Monday, May 19th, 2008 through Wednesday, November 19th, 2008.   

The actual point of closure is on Oglesby Road ½ mile east of C.H. James Parkway at the bridge crossing Powder Springs Creek. Closure is necessary due to bridge replacement over Powder Springs Creek.

Detour Route: From Oglesby Road @ Frank Aiken Road / Furr Avenue will be Furr Avenue east to left on Austell Powder Springs Road to left on Marietta Street to left on Brownsville Road to left on C.H. James Parkway to Oglesby Road.  Detour from Oglesby Road @ C.H. James Parkway will be C.H. James Parkway north to right on Brownsville Road to right on Marietta Street to right on Austell Powder Springs Road to right on Furr Avenue to Oglesby Road.  Click here to view detour map. PDF Icon

For more information call Cobb County DOT at 770.420.6659 or email DOT .


Atlanta Gas Light (AGL) Pipe Work
This message is sent on behalf of AGL: Traveling in downtown Atanta near the Government Center will get tighter than usual during the next few months.
AGL will replace old pipes underneath streets from May 1 through August 30, 2008. The AGL Pipe Replacement Program is part of a 15-year project to replace more than 2,300 miles of bare steel and cast-iron natural gas pipeline infrastructure in Georgia with state-of-the-art plastic and steel pipes.
Work will be done in phases. Expect temporary inconveniences (lane and sidewalk closures, congestion, etc.) and plan accordingly. Click here to view location map. PDF Icon AGL will strive to minimize any impact in the downtown area during construction. Please call 404-584-3039 or email pipelinereplacements@aglresources.com for more information.


Flint Hill Road
Flint Hill Road will be closed to thru traffic between Clay Road and Ewing Road on Thursday, January 31, 2008 and ending on Friday, May 30, 2008.
The actual point of closure is the bridge over Olley Creek. The reason for the closure is removal of bridge and the construction of a box culvert. Detour route will be Ewing Road to Clay Road to Flint Hill Road.
For more information please contact D.M. Culpepper, Sunbelt Structures, Inc. at 770-934-1839.


 

 

 



Cobb DOT Road Project Information  last updated May 13, 2008


Callaway Road Improvements

The purpose of this project is to improve operations and safety along certain segments of Callaway Road. These segments are from Austell Road to Woodleigh Road, and from Al Bishop Road to Kolb Farm Way. The improvements include the addition of a continuous inside turn lane and sidewalk. Also, the Callaway Road at Austell Road intersection will be improved by increasing the storage of the left turn lanes on Austell Road, and by adding a second left turn lane from southbound Callaway Road to eastbound Austell Road.
Callaway Road Fact Sheet PDF



Austell Road Intersections Project
This GRTA-funded project consists of 7 intersection improvement projects along Austell Road, as follows: Clay Road, Hurt Road, Floyd Road, Milford Church Road, Hicks Road, Windy Hill Road and Sandtown Road/ Olive Springs Road.
Cobb DOT has been responsible for design and right-of-way acquisition and GDOT will be responsible for managing construction, which is scheduled to begin mid to late summer 2008.
For questions during construction, contact GDOT District 7 construction office at 770-986-1413. For information regarding project content and layout, contact Nar Chaudhry at Cobb DOT at 770-528-1656 or nar.chaudhry@cobbcounty.org .

Download Austell Road Concept MapsPDF:
Austell Road at Clay Road
Austell Road at Hicks Road
Austell Road at Hurt and Floyd Road
Austell Road at Milford Church Road
Austell Road at Sandtown/Olive Springs Road
Austell Road at Windy Hill Road



Canton Road Corridor
The limits of the Project extend along Canton Road from the northern terminus of the Canton Road Connector north to the Cobb/Cherokee County line.
The project consists of identifying specific safety and operational improvements to Canton Road and key intersections, improved access management for adjacent properties, continuous sidewalks on both sides of the roadway.  This project also includes a raised median between Hembry Drive and Blackwell Square, and other selected locations, based on accident history.

Canton Road Corridor Website


 

County Line Road Safety and Operational Improvements
The purpose of this project is to provide safety improvements and better traffic flow for the County Line Road corridor from Due West Road to Mars Hill Road. 
Icon Factsheet
Please note:  Concept plansPDF Icon are very large files; download times will vary
concept 1, concept 2, concept 3, concept 4, concept 5


 

Dallas Highway at Poplar Springs / Holland Road
These improvements are a component of the 2005 1% Special Purpose Local Option Sales Tax (SPLOST) program. The project consists two separate intersection improvements.  Dallas Hwy. at Poplar Springs Rd./Holland Rd. will be realigned and a traffic signal added if warranted.  Second improvement is  a 90 degree realignment with Old Dallas Rd and Holland Rd.
Icon Fact Sheet , Icon Concept Display


 

Due West Corridor Improvements
The purpose of this project is to improve the operations and safety of the Due West Road corridor from Old Hamilton Road to Burnt Hickory Road as well as provide bicycle connectivity from Burnt Hickory Road at Acworth Due West Road to Burnt Hickory Road at Due West Road. In addition to the safety and operational improvements, the project will improve traffic flow at the existing intersection of Due West Road/Acworth Due West Road at Due West Road/Kennesaw Due West Road.

Icon Concept 1  , Icon Concept 2 , Icon Handout


 

Jamerson Road / Wigley Road
The project consists of various improvements for the Jamerson Road – Jamerson Road/Wigley Road area.  Jamerson Road will be widened from a 2-lane to a 4-lane divided road from Lee Waters Road to Canton Road.  Jamerson Road/Wigley Road will be widened from 2 lanes to 3-lanes from Sandy Plains Road to Lee Waters Road.
PDF Concept Layout 1 , PDF Concept Layout 2


 

Lower Roswell Road
Safety and operational improvements to Lower Roswell Road from Davidson Road to Timber Ridge Road through the addition of turning lanes, bicycle lanes, sidewalk and a multi-use trail.
PDF Fact Sheet , PDF PIOH Handout
Please note:  Concept plansPDF Icon are very large files; download times will vary
concept 1, concept 2, concept 3, concept 4, concept 5


 

Maxham Road Roadway Safety & Operational Improvements
Maxham Road is a 2005 Special Purpose Local Options Sales Tax (SPLOST) program and consists of widening the existing roadway to accommodate 4 -11' lanes with a 20' raised median. U-turn lanes will also be provided at key median breaks. Curb and gutter will be added along the entire length and sidewalk will be introduced along the west side. The alignment will be adjusted to improve any horizontal and vertical curvature deficiencies. The existing bridge over Buttermilk Creek will be widened to accommodate the extra roadway width and sidewalk. The limits of the Maxham Road project are from Old Alabama Road to Veterans Memorial Highway in Cobb County.
 PDF Project Fact Sheet , PDF Board of Commissioners Approved Concept


 

Sandy Plains Road at East Piedmont Road

The proposed project will consist of widening the roadways to provide additional left turn lanes and right turn lanes at each intersection approach.
  PDF Concept Layout1

  PDF Concept Layout2

  PDF Project Fact Sheet / Layout Sheet


 

Shiloh Road/ Shallowford Road
The purpose of this project is to provide safety and operational improvements to the Shiloh Road/Shallowford Road corridor. The improvements include widening of the existing travel lanes to safe widths, the addition of a center turn lane, additional right turn lanes, and increased capacity at the major intersections. In addition, bike friendly lanes and sidewalk will be included in the project.
PDF Fact Sheet , PDF PIOH Handout ,
Concept MapsPDF : concept 1, concept 2, concept 3, concept 4, concept 5, concept 6


 


Stilesboro Road Thoroughfare and Intersection Improvements
This is a thoroughfare and intersection improvements project in the 2005 Special Purpose Local Options Sales Tax (SPLOST) program.  The Board of Commissioners will be considering the approval of concepts for the Stilesboro Road project at their July 10th meeting.


The proposed improvements will consist of three projects: the widening of the existing 2 and 3 lane corridor between Mars Hill Road and Rose Hedge Way to provide one additional travel lane in each direction; the widening of the existing roadway between Paul Samuel Road and Pine Mountain Road to provide one additional auxillary turn lane in each direction; and the widening of Stilesboro Road from Kennesaw Due West Road to Barrett Parkway to consist of two travel lanes in each direction seperated by a raised grassed median.  Each of these projects will include sidewalk, curb and gutter along both sides of the roadway.

   PDF Project Fact Sheet

   PDF Project Location Map

   PDF Kennesaw Due West Road to Barrett Parkway p.2

   PDF Mars Hill Road to Rose Hedge Way

   PDF Paul Samuel Road to Pine Mountain Road 
   
PDF Board of Commissioners Concept Approval


 

Post Oak Tritt Road
Post Oak Tritt Road is a Roadway Safety & Operational Project in the 2005 SPLOST program. This project is to provide safety enhancements and operational improvements that will provide for better traffic flow on Post Oak Tritt Road.
Project length is approximately 4.05 miles. The limits of the project are from Murdock Road to the Cobb/Fulton County Line. Once completed, the entire project will have continuous sidewalk along the north side of the road.
The project consists of widening the existing travel lanes and shoulders to standard widths, providing turn lanes at key intersections and the addition of curb, gutter, and sidewalk on one side. Horizontal and vertical alignment concerns will be addressed, sections of the roadway will be reconstructed to improve the roadway profile and/or increase the radii of substandard curves. No additional traffic signals are anticipated as part of this project. The existing bridge over Piney Grove Creek will be replaced with a new 2-lane structure with pedestrian sidewalk. The current substandard bridge over Harmony Grove Creek will be replaced with 10' wide x 8' high double box culvert.
   Concept Map 1 , Concept Map 2 , Concept Map 3


 

West Sandtown Road at Villa Rica Road Roundabout Concept
The limits of the Project include:  West Sandtown Road at Villa Rica Road to the intersection of Villa Rica Road and Irwin Road. Two roundabouts at these intersections are proposed.  The roundabouts will consist of a 115 foot outside diameter circle with a 10 foot outside urban shoulder and 20 foot wide travel lane. 
In addition, a 4 inch high, 10 foot wide truck apron and traversable curb will be on the inside of the travel lane.  Curb and gutter, sidewalk and median landscaping on Villa Rica Road between roundabouts.  Street lights will be installed along the project area.

Icon Concept   IconPublic Meeting Handout



Windy Hill/ Macland Road Connector
The proposed roadway will connect Windy Hill Road to Macland Road and Powder Springs Road Traffic currently uses several different routes to get to and from Macland Road/Powder Springs Road and Windy Hill Road. Some of these include the use of Callaway Road, Milford Church Road and County Services Parkway, as well as some neighborhood streets as a cut-through. During the morning and evening rush hours these roadways become extremely congested. With traffic volumes expected to increase the traffic congestion during peak periods will continue to be a problem.

In order to alleviate this traffic congestion, a limited access east-west connection from Macland Road/Powder Springs Road to Windy Hill Road has been proposed by Cobb County. Cobb County allocated funds through the Special Purpose Local Option Sales Tax (SPLOST) for the design, right-of-way acquisition and construction of this proposed roadway.

In late October of 2006 a design consultant was contracted by Cobb County to first investigate options to connect Macland Road/Powder Springs Road to Windy Hill Road and to present these options to the public. The goal of the engineering study is to identify one preferred alignment. This is generally defined as one that will be cost effective, minimize impacts to residential and commercial properties, as well as, minimize impacts to environmentally sensitive areas such as wetlands and floodplains.

A project study map has been developed that identifies three alternative alignments. This is strictly a broad brush corridor map and provides a general location for alignments that are being considered.

For additional information, email inquiries or comments to windyconnector@cobbcounty.org .

 PDF Icon  Project Study Map - Revised

 PDF Icon  Project Fact Sheet

 PDF Icon  Project Fact Sheet - Spanish

 PDF Icon  Selection Matrix
 
PDF Icon  Alternative 2B