DOT
Contact Information Page
PUBLIC ANNOUNCEMENTS
Road Closures
Public Meetings
Bid Letting Schedule
Project Update
WORK REQUESTS
Traffic Signal Reporting
Form
Utilities Permit Request
Streetlight Repair Request
Road Maintanance Request
CCT
Buy
CCT tickets online
CCT Route Descriptions
Park and Ride Lots
Fares
ROADWAY & TRAILS
Traffic Cameras
Road Progress Reports
Trails
Planning Studies
Concept Designs
DEVELOPMENT REVIEW
Development
Standards
Standard
Details
OTHER
Online Mapping
Cooperative CORS
Airport
Utilities
Additional Links
Cobb County Government
(770) 528-1000
information@cobbcounty.org
Privacy
Statement
Cobb County...Expect the Best! |
|
|
ROAD REPORT |
| |
Click here for Road
Project Information
Post Oak Tritt Road
Post Oak Tritt Road will be closed to thru traffic between Johnson Ferry Road and McPherson Road beginning Saturday, May 24th, 2008 through Sunday, August 3rd, 2008. The actual points of closure on Post Oak Tritt Road are approximately 125 feet west of McPherson Road and approximately 2000 feet east of Johnson Ferry Road. Closure is necessary due to roadway grade changes and box culvert construction.
Click here to view detour map.
From Post Oak Tritt Road @ Johnson Ferry Road will be Johnson Ferry Road north to right on Shallowford Road to right on McPherson Road to Post Oak Tritt Road. Detour from Post Oak Tritt Road @ McPherson Road will be McPherson Road north to left on Shallowford Road to left on Johnson Ferry Road to Post Oak Tritt Road.
For more information call Cobb County DOT at 770.420.6659 or email DOT.
Bells Ferry Road Bridge Rehabilitation
Bells Ferry Road will be closed to thru traffic between I-575 and Chastain Road beginning Monday, June 2nd, 2008 through Wednesday, July 23rd, 2008. The actual point of closure is on Bells Ferry Road approximately 2000 feet north of Chastain Road where Bells Ferry Road crosses Noonday Creek. Closure is necessary due to replacement of box culvert for Noonday Creek.
Click here for detour map. .gif)
Detour route from Bells Ferry Road @ I-575 will be I-575 South to left on Chastain Road (Exit #3) to Bells Ferry Road. Detour from Bells Ferry Road @ Chastain Road will be Chastain Road west to right on I-575 North to Bells Ferry Road (Exit #4).
For more information call Cobb County DOT at 770.528.1653
Oglesby Road Bridge Rehabilitation
Oglesby Road will be closed to thru traffic between C.H. James Parkway and Frank Aiken Road/ Furr Avenue beginning Monday, May 19th, 2008 through Wednesday, November 19th, 2008.
The actual point of closure is on Oglesby Road ½ mile east of C.H. James Parkway at the bridge crossing Powder Springs Creek. Closure is necessary due to bridge replacement over Powder Springs Creek.
Detour Route: From Oglesby Road @ Frank Aiken Road / Furr Avenue will be Furr Avenue east to left on Austell Powder Springs Road to left on Marietta Street to left on Brownsville Road to left on C.H. James Parkway to Oglesby Road. Detour from Oglesby Road @ C.H. James Parkway will be C.H. James Parkway north to right on Brownsville Road to right on Marietta Street to right on Austell Powder Springs Road to right on Furr Avenue to Oglesby Road. Click here to view detour map. .gif)
For more information call Cobb County DOT at 770.420.6659 or email DOT .
Atlanta Gas Light (AGL) Pipe Work
This message is sent on behalf of AGL: Traveling in downtown Atanta near the Government Center will get tighter than usual during the next few months.
AGL will replace old pipes underneath streets from May 1 through August 30, 2008. The AGL Pipe Replacement Program is part of a 15-year project to replace more than 2,300 miles of bare steel and cast-iron natural gas pipeline infrastructure in Georgia with state-of-the-art plastic and steel pipes.
Work will be done in phases. Expect temporary inconveniences (lane and sidewalk closures, congestion, etc.) and plan accordingly. Click here to view location map. AGL will strive to minimize any impact in the downtown area during construction. Please call 404-584-3039 or email pipelinereplacements@aglresources.com for more information.
Flint Hill Road
Flint Hill Road
will be closed to thru traffic between Clay Road and Ewing Road on Thursday, January 31, 2008 and ending on Friday, May 30, 2008.
The actual point of closure is the bridge over Olley Creek. The reason for the closure is removal of bridge and the construction of a box culvert. Detour route will be Ewing Road to Clay Road to Flint Hill Road.
For more information please contact D.M. Culpepper, Sunbelt Structures, Inc. at 770-934-1839.
Cobb DOT Road Project Information last updated May 13, 2008
|
Callaway Road Improvements
The purpose of this project is to improve operations and safety along certain segments of Callaway Road. These segments are from Austell Road to Woodleigh Road, and from Al Bishop Road to Kolb Farm Way. The improvements include the addition of a continuous inside turn lane and sidewalk. Also, the Callaway Road at Austell Road intersection will be improved by increasing the storage of the left turn lanes on Austell Road, and by adding a second left turn lane from southbound Callaway Road to eastbound Austell Road. Callaway Road Fact Sheet .gif)
|
Austell Road Intersections Project
This GRTA-funded project consists of 7 intersection improvement projects along Austell Road, as follows: Clay Road, Hurt Road, Floyd Road, Milford Church Road, Hicks Road, Windy Hill Road and Sandtown Road/ Olive Springs Road.
Cobb DOT has been responsible for design and right-of-way acquisition and GDOT will be responsible for managing construction, which is scheduled to begin mid to late summer 2008.
For questions during construction, contact GDOT District 7 construction office at 770-986-1413. For information regarding project content and layout, contact Nar Chaudhry at Cobb DOT at 770-528-1656 or nar.chaudhry@cobbcounty.org .
Download Austell Road Concept Maps :
Austell Road at Clay Road
Austell Road at Hicks Road
Austell Road at Hurt and Floyd Road
Austell Road at Milford Church Road
Austell Road at Sandtown/Olive Springs Road
Austell Road at Windy Hill Road
Canton Road Corridor
The limits of the Project extend along Canton Road from the northern terminus of the Canton Road Connector north to the Cobb/Cherokee County line.
The project consists of identifying specific safety and operational improvements to Canton Road and key intersections, improved access management for adjacent properties, continuous sidewalks on both sides of the roadway. This project also includes a raised median between Hembry Drive and Blackwell Square, and other selected locations, based on accident history.
Canton Road Corridor Website
|
County Line Road Safety and Operational Improvements
The purpose of this project is to provide safety improvements and better traffic flow for the County Line Road corridor from Due West Road to Mars Hill Road.
Factsheet
Please note: Concept plans are very large files; download times will vary
concept 1, concept 2, concept 3, concept 4, concept 5
|
Dallas Highway at Poplar Springs / Holland Road
These improvements are a component of the 2005 1% Special Purpose Local Option Sales Tax (SPLOST) program. The project consists two separate intersection improvements. Dallas Hwy. at Poplar Springs Rd./Holland Rd. will be realigned and a traffic signal added if warranted. Second improvement is a 90 degree realignment with Old Dallas Rd and Holland Rd.
Fact Sheet , Concept Display
|
Due West Corridor Improvements
The purpose of this project is to improve the operations and safety of the Due West Road corridor from Old Hamilton Road to Burnt Hickory Road as well as provide bicycle connectivity from Burnt Hickory Road at Acworth Due West Road to Burnt Hickory Road at Due West Road. In addition to the safety and operational improvements, the project will improve traffic flow at the existing intersection of Due West Road/Acworth Due West Road at Due West Road/Kennesaw Due West Road.
Concept 1 , Concept 2 , Handout
|
Jamerson Road / Wigley Road
The project consists of various improvements for the Jamerson Road – Jamerson Road/Wigley Road area. Jamerson Road will be widened from a 2-lane to a 4-lane divided road from Lee Waters Road to Canton Road. Jamerson Road/Wigley Road will be widened from 2 lanes to 3-lanes from Sandy Plains Road to Lee Waters Road.
Concept Layout 1 , Concept Layout 2
|
Lower Roswell Road
Safety and operational improvements to Lower Roswell Road from
Davidson Road to Timber Ridge Road through the addition of turning
lanes, bicycle lanes, sidewalk and a multi-use trail.
Fact Sheet , PIOH Handout
Please note: Concept plans are very large files; download times will vary
concept 1, concept 2, concept 3, concept 4, concept 5
|
Maxham
Road Roadway Safety & Operational Improvements
Maxham Road is a 2005 Special Purpose Local Options Sales
Tax (SPLOST) program and consists
of widening the existing roadway to accommodate 4 -11' lanes
with a 20' raised median. U-turn lanes will also be provided
at key median breaks. Curb and gutter will be added along
the entire length and sidewalk will be introduced along
the west side. The alignment will be adjusted to improve
any horizontal and vertical curvature deficiencies. The
existing bridge over Buttermilk Creek will be widened to
accommodate the extra roadway width and sidewalk. The
limits of the Maxham Road project are from Old Alabama
Road to Veterans Memorial Highway in Cobb County.
Project Fact Sheet , Board
of Commissioners Approved Concept
|
Sandy Plains Road at East Piedmont
Road
The
proposed project will consist of widening the roadways to
provide additional left turn lanes and right turn lanes
at each intersection approach.
Concept Layout1
Concept Layout2
Project
Fact Sheet / Layout Sheet
|
Shiloh Road/ Shallowford Road
The purpose of this project is to provide safety and operational
improvements to the Shiloh Road/Shallowford Road corridor. The
improvements include widening of the existing travel lanes to safe
widths, the addition of a center turn lane, additional right turn lanes,
and increased capacity at the major intersections. In addition, bike
friendly lanes and sidewalk will be included in the project.
Fact Sheet , PIOH Handout ,
Concept Maps :
concept 1, concept 2, concept 3, concept 4, concept 5, concept 6
|
Stilesboro Road Thoroughfare and
Intersection Improvements
This is a thoroughfare
and intersection improvements project in the 2005 Special
Purpose Local Options Sales Tax (SPLOST) program.
The Board of Commissioners will be considering the approval
of concepts for the Stilesboro Road project at their July
10th meeting.
The proposed improvements will consist
of three projects: the widening of the existing 2 and 3
lane corridor between Mars Hill Road and Rose Hedge Way
to provide one additional travel lane in each direction;
the widening of the existing roadway between Paul Samuel
Road and Pine Mountain Road to provide one additional auxillary
turn lane in each direction; and the widening of Stilesboro
Road from Kennesaw Due West Road to Barrett Parkway to consist
of two travel lanes in each direction seperated by a raised
grassed median. Each of these projects will include
sidewalk, curb and gutter along both sides of the roadway.
Project Fact Sheet
Project Location Map
Kennesaw
Due West Road to Barrett Parkway p.2
Mars
Hill Road to Rose Hedge Way
Paul Samuel
Road to Pine Mountain Road
Board
of Commissioners Concept Approval
|
Post
Oak Tritt Road
Post Oak Tritt Road is a Roadway Safety & Operational
Project in the 2005 SPLOST program. This project is to provide
safety enhancements and operational improvements that will
provide for better traffic flow on Post Oak Tritt Road.
Project length is approximately 4.05 miles. The limits of
the project are from Murdock Road to the Cobb/Fulton County
Line. Once completed, the entire project will have continuous
sidewalk along the north side of the road.
The project consists of widening the existing travel lanes
and shoulders to standard widths, providing turn lanes at
key intersections and the addition of curb, gutter, and
sidewalk on one side. Horizontal and vertical alignment
concerns will be addressed, sections of the roadway will
be reconstructed to improve the roadway profile and/or increase
the radii of substandard curves. No additional traffic signals
are anticipated as part of this project. The existing bridge
over Piney Grove Creek will be replaced with a new 2-lane
structure with pedestrian sidewalk. The current substandard
bridge over Harmony Grove Creek will be replaced with 10'
wide x 8' high double box culvert.
Concept
Map 1 , Concept
Map 2 , Concept
Map 3
|
West Sandtown Road at Villa Rica Road Roundabout Concept
The limits of the Project include: West Sandtown Road at Villa Rica Road to the intersection of Villa Rica Road and Irwin Road. Two roundabouts at these intersections are proposed. The roundabouts will consist of a 115 foot outside diameter circle with a 10 foot outside urban shoulder and 20 foot wide travel lane.
In addition, a 4 inch high, 10 foot wide truck apron and traversable curb will be on the inside of the travel lane. Curb and gutter, sidewalk and median landscaping on Villa Rica Road between roundabouts. Street lights will be installed along the project area.
Concept Public Meeting Handout
|
Windy
Hill/ Macland Road Connector
The proposed roadway will connect Windy Hill Road to Macland
Road and Powder Springs Road Traffic currently uses several
different routes to get to and from Macland Road/Powder
Springs Road and Windy Hill Road. Some of these include
the use of Callaway Road, Milford Church Road and County
Services Parkway, as well as some neighborhood streets as
a cut-through. During the morning and evening rush hours
these roadways become extremely congested. With traffic
volumes expected to increase the traffic congestion during
peak periods will continue to be a problem.
In order to alleviate this traffic congestion, a limited
access east-west connection from Macland Road/Powder Springs
Road to Windy Hill Road has been proposed by Cobb County.
Cobb County allocated funds through the Special Purpose
Local Option Sales Tax (SPLOST) for the design, right-of-way
acquisition and construction of this proposed roadway.
In late October of 2006 a design consultant was contracted
by Cobb County to first investigate options to connect Macland
Road/Powder Springs Road to Windy Hill Road and to present
these options to the public. The goal of the engineering
study is to identify one preferred alignment. This is generally
defined as one that will be cost effective, minimize impacts
to residential and commercial properties, as well as, minimize
impacts to environmentally sensitive areas such as wetlands
and floodplains.
A project study map has been developed that identifies three
alternative alignments. This is strictly a broad brush corridor
map and provides a general location for alignments that
are being considered.
For additional information, email inquiries or comments to windyconnector@cobbcounty.org .